Summit Store #9 is scheduled to open in the 1st quarter of 2021, this renovated location will feature a 1800 traditional convenience store, a deli, a car wash and a drive through window with a Chester’s Chicken offering.

General Contractor(s):
Williams Construction williamsconstructiongroup.com
D&M Petroleum www.dmpetroleum.com